Randy is continuing  the yard construction. 

 First photo shows the view from the north end of the yard (click thumbnail to enlarge photo).

This photo taken from the north end switches shows that the left and middle tracks are finished at the north end.

The middle track ends about midway through the yard.  Note that some of the rails are bent to shape for the final part of middle track.  Also note that some fill is required on the right side before the right track can be installed in this area.

The two switches are installed at the south end of the yard.  

This shows the link between the south end switches and the mainline.    The left track is operational through the yard.  