Oct 22, 2013 - Future Parking Lot

October 22, 2013

 Photo shows the driveway crossing at the logging line.   Clee cleaned the bank on the right --- looks great.

 This photo shows new roadway branching to the left part way up the hill.   There used to be a deep gulley between the driveway and the dozer. The gully is now a drainage swale with a culvert.   The area around the dozer will be a new parking area.   

 

This photo shows the former gully.  Clee and Dick have keep the dozer and backhoe busy.