Painfully slow progress is being made on the many work items needed for the convention. The rain finally let up enough so that the transfer table roof frame could be painted and the roof panels installed. Photo shows table in the down position.
This photo shows the table in the full up position. Note that the roof goes up too so that there is adequate clearance (about 3 feet) for most equipment. We're short one panel but that will be a quick job to finish the project once the panel is secured.