The crew has been busy grading parking areas and removing brush, especially multifloral rose and russian olive. Photo shows expanded parking area to the right of Clee block. The logging division tracks are now visible from the driveway.

This photo is taken further up the driveway. The open ditch to the right of the power pole will be filled in so that the entire area can be used for parking.

The brush along the south end of the trestle has been pulled out so that the entire trestle is now visible.

The new steps up the sand hill bank are essentially finished. We are considering a second board halfway between the railing and steps for our short friends (or tipsy friends of all sizes).

Happy Thanksgiving!